Hot melt bitumen polyester reinforced waterproofing membrane


Preço por unidade:

USD $ 1.09 - 5.35

Quantidade Mínima de Compra:

>=500 square meter

Tipo de pagamento:

L/C (Carta de Crédito)

T/T (Transferência Bancária)

Outros

Porto de Preferência:

shenzhen or shekou

Descrição

Descrição do produto Overview Quick Details
Place of Origin:
CHN
Brand Name:
HONGCE
Model Number:
Asphalt waterproofing material
Type:
Modified Bitumen
Grade:
Top Grade
Product Name:
Asphalt waterproofing rolling material
Material:
SBS modified asphalt
Thickness:
2mm/2.5mm/2.8mm/3mm/3.5mm/4mm/4.5mm/5mm/5.5mm
Width:
1M
Length:
9.6m/roll,10m/roll
Surface:
Polyethylene PE, aluminum film, sand/mineral granule
Color:
Black
Appliation:
Roof waterproofing,Waterproof project
Feature:
High strength
Packing:
Per roll in woven bags/Standard seaworthy packing
Supply Ability
Supply Ability:
20000 Square Meter/Square Meters per Day
Packaging & Delivery

Hot melt bitumen polyester reinforced waterproofing membrane

Product Name

Hot melt bitumen polyester reinforced waterproofing membrane

Material

Butyl rubber

After sale Service

Online technical support

Thickness

0.8mm/1.0mm/1.2mm/1.5mm

Width

5cm/10cm/15cm/20cm/40cm/50cm/100cm

Keyword

Aluminum flashing butyl tape

Length

5m/roll  10m/roll or customized

Usage

House leakage repair/
Waterproof repair tape/Waterproof Projects

Surface

Aluminum foil

Color

White or customized

Application

Self adhesive Butyl flash tape is made of high quality butyl rubber. It is widely used for construction joints which require
waterproof and airtight seal, such as for the connection of corrugated roofing, automobile parts, steel boards, polycarbonate board etc.

Packing

Per roll in woven bags/Standard seaworthy packing

MOQ

500rolls

Payment Term

T/T, Irrevocable L/C at sight (30% deposit)

Delivery Time

within 10-15 days after receive 30% deposit or depend on Quantity

Trade Terms

EXW, FOB, CFR, CIF

Sample

Available


FAQ

Q:
 Are you trade company or manufacturer?

A: We are professional manufacturer,we have the lowest price and sufficient supply.

 

Q:what are your terms of payment?

A:T/T 30% as deposit and 70% before delivery. We'll show you pictures of the product and package before you pay the balance.

 

Q:what are your delivery terms?

A:FOB, CFR, CIF
,EXW
.

 

Q:what about delivery time?

A:generally speaking, it takes 
10
 days after receiving your advance payment. The specific delivery time depends on the item and quantity of your order.

 

Q.Can you produce according to the sample?

A:yes, we can produce according to your samples or technical drawings.

 

Q:what is your sample policy?

A: if we have ready-made parts, we can provide samples, but the customer needs to pay the sample fee and express cost.

 

Q:so far. Will you inspect all the goods before shipment?

A:yes, we did 100% of the testing before delivery.

 

Q: How could you guarantee your products? 

A:Each piece of products is manufactured by certified workshops, inspected by piece by piece according to
 national QA/QC standard. We also could issue the warranty to customer to guarantee the quality. 


Q: How can I get your quotation as soon as possible? 

A:The email and fax will be checked within 24 hours,meanwhile,the Skype,
 Wechat and WhatsApp
 will be online in 24 hours.Please send us your requirement , we will work out a best price soon.

 

Comentarios
Bienvenidos a los comentarios de comerciaisinfo! Mantenga las conversaciones cortés y sobre el tema. Fomentar conversaciones productivas y respetuosas, Puedes ver comentarios de nuestros Gerentes de Comunidad.
Registrarse para publicar
Ordenar por
Inicia sesión para mostrar más comentarios

Meo Machinery Co.LTD

Total de Empregados
  • 501-1000 pessoas

Ano Estabelecido
  • 2000

Contato e localização
  • Hangzhou,Zhejiang Province,China(Mainland)