Descrição
-
Condition:
- New
-
Warranty:
- 1 Year
-
Applicable Industries:
- Manufacturing Plant, Energy & Mining
-
Showroom Location:
- None
-
Video outgoing-inspection:
- Provided
-
Machinery Test Report:
- Provided
-
Marketing Type:
- Ordinary Product
-
Warranty of core components:
- 1 Year
-
Core Components:
- Bearing, Gearbox, PLC
-
Place of Origin:
- Sichuan, China
-
Brand Name:
- DTEC
-
Model Number:
- C0.5-1.25/0.9
-
Electricity Generator Type:
- Thermal Power
-
Output Voltage (V):
- 400
-
Key Selling Points:
- Long Service Life
-
Application:
- Power Generation/steam supply
-
Name:
- Extraction Steam Turbine 500KW Model C0.5-1.25/0.9
-
Certificate:
- ISO9001,CE
-
Rated power:
- 500KW
-
Rated voltage:
- 400V
-
Usage:
- Thermal
-
Rotating speed:
- 5600
-
Structure:
- Single layer
-
Generator:
- Three Phase
-
Supply Scope:
- Complete Solution
-
After-sales Service Provided:
- Free spare parts, Field maintenance and repair service, Video technical support, Online support, Field installation, commissioning and training
-
Local Service Location:
- None
- Supply Ability:
- 10 Set/Sets per Month
|
No. |
Item |
Parameters |
|
|
1 |
Model |
CN0.5-1.25/0.9 |
|
|
2 |
Power |
500KW |
|
|
3 |
Inlet pressure |
1.25Mpa |
|
|
4 |
Inlert flow |
8t/h |
|
|
5 |
Inlet temperature |
189.9 |
|
|
6 |
Extraction flow |
8t/h |
|
|
7 |
Extraction pressure |
0.9Mpa |
|
|
8 |
Extraction temperature |
175 |
|
|
9 |
Exhaust pressure |
0.01Mpa |
|
|
10 |
Speed |
5600rpm |
|
|
11 |
Turbine direction |
According to the direction of generator |
|
|
12 |
Main material |
Front casing |
ZG230-450 |
|
Rear casing |
HT250 |
||
|
Blade |
1cr13 |
||
|
Impeller |
35crMoA |
||
|
Main shaft |
35crMoA |
||
|
Front/rear bearing seat |
HT250 |
||
|
Main valve housing |
ZG230-450 |
||
|
13 |
Diameter (inner diameter) of inlet/exhaust pipe |
DN150/ DN600 |
|
|
14 |
Inlet & exhaust direction |
Side inlet/upper exhaust |
|
|
15 |
Overspeed protection mode |
Two out of three automatic overspeed protection+mechanical flying hammer emergency breaking protection device |
|
|
16 |
Operation speed of overspeed protection |
6160-6272r/min |
|
|
17 |
Overspeed protection response time |
< |
|
Our advantages:
1. With a steam turbine manufacture experience of more than 20 years.
2. We offer turnkey service, including project design, production,construction, installation, and adjustment.
3. Low steam consumption rate, high efficiency to help customer save cost.
4. Strong overload capacity, easy to operate, safety guaranteed
5. We offer customed products.
Meo Machinery Co.LTD
Total de Empregados
- 501-1000 pessoas
Ano Estabelecido
- 2000
Contato e localização
Hangzhou,Zhejiang Province,China(Mainland)