Descrição
Descrição do produto
Overview
Quick Details
coupling. The stator includes steam inlet, cylinder, diaphragm, stator cascade, steam seal and bearing.
Steam Turbine Seal Ring
Because of its reliable function and simple installation requirements, O-ring is the most common mechanical design for sealing. The O-ring is subjected to tens of megapascal (kilo pounds) of pressure. O-rings can be used in static applications as well as in dynamic applications where there is relative movement between components, such as the shaft of a rotary pump and the piston of a hydraulic cylinder.
Steam turbine, also known as steam turbine engine, is a kind of rotating steam power device. High temperature and high pressure steam passes through fixed nozzle and becomes accelerated air flow, and then it is sprayed onto the blade to make the rotor with blade row rotate and work externally at the same time. Steam turbine is the main equipment of modern thermal power plant. It is also used in metallurgical industry, chemical industry and marine power plant.
Operating of Steam Turbine
Steam turbine is an external combustion rotary machine that can convert steam heat energy into mechanical work. After the steam from the boiler enters the steam turbine, it passes through a series of annular nozzles and moving blades in turn, converting the heat energy of the steam into mechanical energy for the rotation of the steam turbine rotor.
Related Products
Our Company >>
Dongfang Yoyik Engineering Co., Ltd was founded in 2004 and specialized in manufacturing spare parts for steam turbines, turbine generators, boilers, etc. We provide products for power plants distributed to worldwide.
We have built long-term business relationship on the basis of providing reliable and successful solutions.
Packing >>
STANDARD & SOLID PACKAGING ENSURES YOUIR GOODS SAFETY.
VARIOUS PROFESSIONAL PACKAGES AT YOUR CHOICE.
Shipping >>
FAQ >>
Q: Are you trading company or manufacturer?
A: We are factory located in Deyang, China.
Q: How long is your delivery time?
A: Generally it is 2-5 days if the goods are in stock. Or it is 7-21 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples? Is it free or extra?
A: Sorry we do not offer samples.
Q: What is your term of payment?
A: Our payment term is T/T 100% advance payment.
If you have another question, please feel free to contact us as below:
-
Condition:
- New
-
Warranty:
- 1 Year
-
Applicable Industries:
- Manufacturing Plant, Farms, Energy & Mining
-
Showroom Location:
- None
-
Video outgoing-inspection:
- Provided
-
Machinery Test Report:
- Provided
-
Marketing Type:
- Ordinary Product
-
Warranty of core components:
- 1 Year
-
Core Components:
- seal ring
-
Place of Origin:
- Sichuan, China
-
Brand Name:
- YOYIK
-
Model Number:
- 118*3.55
-
Type:
- Plant
-
Electricity Generator Type:
- THERMAL POWER
-
Output Voltage (V):
- 220
-
Key Selling Points:
- High Safety Level
-
Power:
- Exhaust Conditions
-
Application:
- Power
-
Rated power:
- 10kw-1000kw
-
Certificate:
- ISO9001
-
Efficiency:
- High Effiency
-
Operation:
- Reliable
-
Manufacturer:
- YOYIK (DEYANG)
-
Usage:
- Thermal
-
After-sales Service Provided:
- Video technical support
- Supply Ability:
- 1000 Piece/Pieces per Year 118*3.55 steam turbine O seal ring yoyik high quality
Steam Turbine Structure & Spare Parts
Steam turbine body is composed of rotating part and static part. The rotor includes main shaft, impeller, moving blade andcoupling. The stator includes steam inlet, cylinder, diaphragm, stator cascade, steam seal and bearing.
Steam Turbine Supporting Facilities
Steam turbine usually works under the condition of high temperature, high pressure and high speed. It is a kind of relatively precise heavy machinery. Generally, it must form a complete set of equipment with boilers, generators, condensers, heaters, pumps, etc. to work in coordination.Factory
Our FactoryWorkshop
Our WorkshopWarehouse
Our WarehouseProduction
Production Line
Our coorperation with well-known enterprises in the industry.
We have built long-term business relationship on the basis of providing reliable and successful solutions.
Packing >>
STANDARD & SOLID PACKAGING ENSURES YOUIR GOODS SAFETY.
VARIOUS PROFESSIONAL PACKAGES AT YOUR CHOICE.
Shipping >>
Shipping Methods | Range | Time | Cost | Tracing |
By Air | World wide | 1-2 wks | Average | Not traceable |
By Sea | 1-3 Months | Cheap | Tracking ID available | |
International Express | 4-7 Days | Expensive |
A: We are factory located in Deyang, China.
Q: How long is your delivery time?
A: Generally it is 2-5 days if the goods are in stock. Or it is 7-21 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples? Is it free or extra?
A: Sorry we do not offer samples.
Q: What is your term of payment?
A: Our payment term is T/T 100% advance payment.
If you have another question, please feel free to contact us as below:
Comentarios
Bienvenidos a los comentarios de comerciaisinfo! Mantenga las conversaciones cortés y sobre el tema. Fomentar conversaciones productivas y respetuosas,
Puedes ver comentarios de nuestros Gerentes de Comunidad.
Registrarse para publicar
Inicia sesión para mostrar más comentarios
Meo Machinery Co.LTD
Total de Empregados
- 501-1000 pessoas
Ano Estabelecido
- 2000
Contato e localização
Hangzhou,Zhejiang Province,China(Mainland)